The Challenge
Leyton Orient Football Club (LOFC) was seeking a trusted partner to manage their complex utility needs and identify opportunities for cost savings and sustainability improvements.
The club faced challenges including:
- Managing multiple utility suppliers and time-consuming administrative queries.
- Keeping up with legislative changes and compliance requirements.
- Identifying opportunities for long-term energy savings and sustainable infrastructure investment.
The Approach
A utility management strategy designed to reduce costs and their carbon footprint while improving operational efficiency. Stadia Utilities worked closely with the club from the outset, providing a transparent onboarding and procurement process.
The Solution
Stadia Utilities managed the procurement and installation of a 280kW solar PV system across the stadium roofs – a project generating over 250,000 kWh annually. Opting for a Power Purchase Agreement (PPA), LOFC are now able to turn unused solar energy into a reliable income stream by exporting it to the Grid. Ultimately, maximising the value of their solar assets.
The Stadia team’s proactive engagement includes:
- Providing real-time access to consumption data and performance insights.
- Offering hands-on project management and market intelligence.
- Smooth onboarding and registration for export eligibility
Solar PV Export Contracts
By choosing to export excess power back to the Grid it not only supports LOFC’s decarbonisation targets it also ensures the best possible return on every kilowatt produced – improving ROI on solar assets while contributing to national energy security.
Results
- 250,000+ kWh generated annually through the new solar PV system.
- Significant financial savings achieved via a competitive procurement process and improved utility management through solar PV exports – tapping into wholesale market rates.
- Long-term sustainability and compliance ensured, with ongoing support and contract management from the Stadia Utilities team.